Current time: Refresh
Agencies » Manchester Bee Network
• 471-Rochdale - Bury - Bolton
Remove ads by becoming a Premium User
Vehicle 2015 Waiting 9:10. 0:53 ahead of going ←Bolton Interchange
at Bolton Interchange Last seen 9:10
Vehicle 2031 1:11 ahead of going ←Bolton Interchange
past Shiffnall Street on Bradshawgate
Vehicle 2011 2:22 ahead of going ←Bolton Interchange
past Crawford Street on Bradford Street
Vehicle 2119 2:07 behind going ←Bolton Interchange
aprchg Starling Road on Bury And Bolton Road
Vehicle 2043 1:44 behind going ←Bolton Interchange
aprchg Bury East Lancs Railway on Bolton Street
Vehicle 2102 2:41 behind going ←Bolton Interchange
near Heap Bridge on Bury New Road
Vehicle 2108 0:24 ahead of going ←Bolton Interchange
near Wild Street on Rochdale Road East
Vehicle 2105 3:41 behind going ←Bolton Interchange
near Rochdale Interchange on Smith Street
Vehicle 2115 3:37 behind going →Rochdale Interchange
at Bolton Interchange
Vehicle 2003 1:23 ahead of going →Rochdale Interchange
near Top o'th' Carrs on Bury & Bolton Road
Vehicle 2025 2:50 ahead of going →Bury Interchange
at Bury Interchange on Haymarket Street Last seen 4:07
Vehicle 2050 4:35 behind going →Rochdale Interchange
past Pimhole Road on Rochdale Road
Vehicle 4130 0:15 ahead of going →Rochdale Interchange
at Market Street on Bamford Road
Vehicle 2028 4:24 ahead of going →Rochdale Interchange
past Roch Valley Way on Manchester Road
Vehicle 3279 0:36 ahead of going →Rochdale Interchange
past Rochdale Railway Station on Station Road
Vehicle 2049 Waiting 17:59. 3:33 ahead of going →Rochdale Interchange
aprchg Rochdale Interchange on Water Street Last seen 17:59
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
From Monday 19 January, there will be no access to the single-story park and ride, whilst works take place.
Due to overnight roadworks on Manchester Road, bus services will operate on diversion every night from 8pm to 5am.
Between Monday 30 March and Friday 10 April, there will be fewer parking spaces available at Brooklands Park and Ride facility while engineering works are carried out.