Current time: Refresh
Agencies » Manchester Bee Network
• 216-Manchester - Clayton - Droylsden - Ashton
Remove ads by becoming a Premium User
Vehicle BD74WHL Waiting 5:46. 1:28 ahead of going →Ashton-under-Lyne Interchange
near Faraday Street on Lever Street
Vehicle BD74WHV 1:27 ahead of going →Ashton-under-Lyne Interchange
at North Road on Ashton New Road
Vehicle BU25YVK 1:24 behind going →Ashton-under-Lyne Interchange
aprchg Droylsden Metrolink Stop on Ashton Road
Vehicle BU25YVX Waiting 13:53. 1:59 ahead of going →Ashton-under-Lyne Interchange
aprchg Katherine Street on Gas Street Last seen 13:53
Vehicle BU25YWW Waiting 1:43:43. 2:36 ahead of going →Ashton-under-Lyne Interchange
aprchg Ashton-under-Lyne Interchange on Water Street Last seen 1:43:43
Vehicle BU25YVD Waiting 41:05. 3:09 behind going →Ashton-under-Lyne Interchange
aprchg Ashton-under-Lyne Interchange on Water Street Last seen 40:58
Vehicle BU25YWH 0:14 ahead of going →Ashton-under-Lyne Interchange
aprchg Katherine Street on Gas Street
Vehicle BD74WHJ Waiting 17:10. 6:54 behind going →Ashton-under-Lyne Interchange
aprchg Katherine Street on Gas Street Last seen 17:10
Vehicle BU25YXF 7:45 behind going ←Piccadilly Gardens
aprchg City Football Academy on Ashton New Road
Vehicle BU25YXD 3:51 behind going ←Piccadilly Gardens
aprchg Cemetery Road Metrolink Stop on Manchester Road
Vehicle BU25YVM 0:38 behind going ←Piccadilly Gardens
at Ashton Moss on Manchester Road
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
From Monday 19 January, there will be no access to the single-story park and ride at Oldham Mumps. Works will also take place at the multi-storey car park.
A one-way closure is in place on Armentieres Square and Trinity Street, whilst Market street is closed in both directions. During this time, bus services are on diversion.
Between Monday 30 March and Friday 10 April, there will be fewer parking spaces available at Brooklands Park and Ride facility while engineering works are carried out.
The mezzanine to Fairfield Street escalator at Piccadilly Station will be out of service for refurbishment from Monday 9 February, with the works expected to last around six weeks. Please follow the signage for the lift from platform level to the mezzanine and mainline station.