Current time: Refresh
Agencies » Manchester Bee Network
• 368-Wythenshawe - Stockport
Remove ads by becoming a Premium User
From 31 March 2025 until Spring 2026, Network Rail will be carrying out work to install a new railway bridge and roundabout. For the duration of the works, bus services are on diversion.
Vehicle MJ74JNU Waiting 17:26. 7:43 behind going ←Wythenshawe Interchange
aprchg Rowlandsway on Poundswick Lane Last seen 17:26
Vehicle LF69UXV Waiting 1:39:22. 0:47 behind going ←Wythenshawe Interchange
aprchg Rowlandsway on Poundswick Lane Last seen 1:39:22
Vehicle LF69UYM Waiting 1:20:37. 4:32 behind going ←Wythenshawe Interchange
aprchg Rowlandsway on Poundswick Lane Last seen 1:20:37
Vehicle LV74CGO Waiting 28:54. 11:15 behind going ←Wythenshawe Interchange
aprchg Rowlandsway on Poundswick Lane Last seen 28:54
Vehicle MJ74JRX Waiting 46:04. 9:30 behind going ←Wythenshawe Interchange
aprchg Rowlandsway on Poundswick Lane Last seen 45:39
Vehicle MJ74JPX 14:19 behind going ←Wythenshawe Interchange
past Cheadle Road on Turves Road
Vehicle YN61BGF Bee Network 0:42 behind going ←Wythenshawe Interchange
at Twining Brook Road on Ladybridge Road
Vehicle LF69UYX 6:43 behind going ←Wythenshawe Interchange
at Stockport Interchange
Vehicle MX62GVE Bee Network 3:16 ahead of going →Stockport Interchange
at Wythenshawe Interchange on Poundswick Lane
Vehicle SJ15PVE Bee Network 0:43 behind going →Stockport Interchange
at Neal Avenue on Finney Lane
Vehicle MJ74JNF 3:07 behind going →Stockport Interchange
aprchg Carnforth Road on Bird Hall Road
Missing vehicles
Scheduled to be at Grand Central on Wellington Road South going to →Stockport Interchange.
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
From Monday 19 January, there will be no access to the single-story park and ride, whilst works take place.
Between Monday 30 March and Friday 10 April, there will be fewer parking spaces available at Brooklands Park and Ride facility while engineering works are carried out.
The mezzanine to Fairfield Street escalator at Piccadilly Station will be out of service for refurbishment from Monday 9 February, with the works expected to last around six weeks. Please follow the signage for the lift from platform level to the mezzanine and mainline station.
From Saturday 28 March, we’re changing the route to run via Greek Street in Stockport town centre following the completion of the rail bridge replacement work.