Current time: Refresh
Agencies » Manchester Bee Network
• 368-Wythenshawe - Stockport
Remove ads by becoming a Premium User
From 31 March 2025 until Spring 2026, Network Rail will be carrying out work to install a new railway bridge and roundabout. For the duration of the works, bus services are on diversion.
Vehicle MJ74JKV 0:04 behind going ←Wythenshawe Interchange
aprchg Bruntwood Lane on Turves Road
Vehicle MJ74JLV 1:06 ahead of going ←Wythenshawe Interchange
at Worrall Street on Mercian Way
Vehicle MJ74JNN 8:12 ahead of going ←Wythenshawe Interchange
near Stockport Interchange
Vehicle MJ74JPO 4:09 ahead of going →Stockport Interchange
near Wythenshawe Interchange on Poundswick Lane
Vehicle LV74KNF 5:47 behind going →Stockport Interchange
aprchg Shone Avenue on Peel Hall Road
Vehicle LV74CGK 2:10 ahead of going →Stockport Interchange
at Cheadle Old Road on Edgeley Road
Missing vehicles
Scheduled to be at Stockport Interchange going to →Stockport Interchange.
Between January and March, there will be fewer parking spaces available at Whitefield Park and Ride facility while Engineering works are carried out.
From Monday 19 January, there will be no access to the single-story park and ride at Oldham Mumps. Works will also take place at the multi-storey car park.
The bus stop at Tesco on High Street is closed due to works taking place.
The mezzanine to Fairfield Street escalator at Piccadilly Station will be out of service for refurbishment from Monday 9 February, with the works expected to last around six weeks. Please follow the signage for the lift from platform level to the mezzanine and mainline station.