Agencies » Boston MBTA

SL2-Design Center - South Station

to

Courthouse Escalator 415 (Airport/Design Center platform to lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Route: SL2-Design Center - South Station
Shown Sat Dec 28 2024 to now
Courthouse Escalator 417 (Airport/Design Center platform to south lobby) unavailable due to ongoing construction at the station. Started Tue May 25 2021
Route: SL2-Design Center - South Station
Shown Sat Dec 28 2024 to now
Please board all outbound Providence/Stoughton Line trains using the temporary outbound platform (Track 3) at Readville today. Started Mon Aug 4
Affected direction: Outbound

Affected stops:
Readville
Shown Mon Aug 4 to now
Please board Worcester Line Train 565 (5:30 pm from South Station) on the inbound platform (Track 2) at Framingham today. Started Until
Affected direction: Outbound

Affected stops:
Framingham
Shown to now
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1
Route: SL2-Design Center - South Station
Shown Tue Apr 1 to now