Vancouver TransLink

 •  130-Willingdon

 
Map
 

Leaflet | Map data © OpenStreetMap contributors

Stop 51542 Northbound Willingdon Ave @ Goard Way is temporarily closed from Tue May 26 through Tue Jun 9 due to construction. Starts Tue May 26 Until Wed Jun 10
Stop 51389 Brentwood Station @ Bay 7 has temporarily moved to the next stop by Dawson St 51390 from Mon May 25 to Mon Jun 22 from 7:00 AM to 5:00 PM daily due to construction. Starts Mon Jun 22 Until Mon Jun 22
Stop 51470 Kootenay Loop @ Bay 6 has temporarily moved 185 metres west from Wed May 27 to Sun May 31 from 7:00 PM to 5:00 AM nightly, due to construction. Starts Sat May 30 Until Sun May 31
Stop 58143 Kootenay Loop @ Bay 8 is temporarily closed from Wed May 27 to Sun May 31 from 7:00 PM to 5:00 AM nightly, due to construction. Starts Sat May 30 Until Sun May 31

R5 Hastings St to Burrard/222 Metrotown Station stop has been moved to Eastbound Hastings St @ Skeena St
Stop 52739 Northbound Willingdon Ave @ Deer Lake Parkway has temporarily moved 60 meters north to a temporary stop from Tue May 26 through Tue Jun 9, due to construction. Starts Tue May 26 Until Wed Jun 10
To provide more service to the FIFA Fan Festival Vancouver, the 130 Phibbs Exchange/Metrotown Station will be on detour from Mon Jun 8 through Sun Jul 19. Starts Mon Jun 8 Until Mon Jul 20

Detour details:

130 Phibbs Exchange: Regular route to E Hastings and Cassiar Connector, then continue E Hastings, Renfrew, McGill St, Ironworkers Memorial Bridge, then resume regular route.

130 Metrotown Station: Regular route to Ironworkers Memorial Bridge and McGill St off-ramp, then via McGill St Off-ramp, McGill St, Renfrew, E Hastings, then resume regular route


Affected stops:
50954 Eastbound E Hastings St @ Cassiar St
Stop 51458 Northbound Willingdon Ave @ Juneau St is temporarily closed beginning Monday May 11. Started Fri May 15