Boston MBTA

 •  Framingham/Worcester Line

 
Map
 
Please board all outbound Providence/Stoughton Line trains using the temporary outbound platform (Track 3) at Readville today. Started Mon Aug 4
Affected direction: Outbound

Affected stops:
Readville

Leaflet | Map data © OpenStreetMap contributors

South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. Started Tue Apr 1
Worcester Line Train 502 (4:15 am from Worcester) is operating 10-20 minutes late between Framingham and South Station due to an unruly passenger. Started Until
Affected direction: Inbound
The Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction. Started Mon Jan 24 2022
There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. Started Fri Feb 28 2025
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.