•  52-Irving Stop Map

 
Map
 

Leaflet | Map data © OpenStreetMap contributors

Intermittent Stop Closures During River Road Repaving Starts Mon Aug 3 Until Tue Oct 20
Stops for Routes 51, 52, and 55 on River Rd. north of Beltline and south of Green Ln. may be inaccessible during a repaving project from August 3 - October 20.

If these stops are blocked by construction, use the stop at River Rd. north of River Ave. or Santa Clara Station.

For information on which areas are currently being worked on, check the current City of Eugene roadwork advisories at: https://www.eugene-or.gov/1191/Road-Work-Advisories.