Calgary Transit
• 3-Sandstone/Elbow Dr SW
Starting Friday, September 5 at 8 p.m. through Saturday, September 6 at 6 p.m., Centre Street N. between 43 Avenue N.E. and 44 Avenue N.E. will be closed for utilities work. Routes 3, 300, and MAX Green will be detoured.
Northbound routes 3, 300, and MAX Green will travel:
- From North on Centre Street N.
- East on 43 Avenue N.E.
- North on Centre A Street N.E.
- West on 44 Avenue N.E.
- North on Centre Street N., resume regular routing.
The following stop will be temporarily closed:
- NB Centre ST N. @ 43 AV N. (#8792)
Please use the following stop in lieu of the closed stop:
- EB 43 AV N.E. @ Centre ST N. far side
On Saturday, September 6 between 5 a.m. - 5 p.m., lane closures will be in effect on Centre Street @ Blackthorn Road N. for paving. Route 3 will have a stop closure.
The following stop will be temporarily closed:
- SB Centre ST N @ Tache AV N (#5170)
Please use the following stops:
- SB Centre ST N @ 64 AV N (#8793)
- SB Centre ST N @ 60 AV N (#8748)
Leaflet | Map data © OpenStreetMap contributors
Starting Monday, July 14 at 9 a.m. through Wednesday, December 31 to the end of service, the right-hand lane on 6 Avenue S.W. between 1 Street S.W. and Centre Street S. will be closed for Suncor Energy Centre construction. Routes 1, 2, 3, 4, 17, 70 and 101 will have stop closures.
The following stops will be temporarily closed:
- WB 6 AV S.W. @ 1 ST S.W. (#5115) - Routes 2 & 4
- WB 6 AV S.W. @ E. of 1 ST S.W. (#6334) - Routes 1, 3, 17 & 101
- WB 6 AV S.W. @ E. of 1 ST S.W. (#6323) - Route 70
Please use the following stops in lieu of the closed stops:
- WB 6 AV S.W. @ 2 ST S.W. (#5178) - Routes 1 & 3
- WB 6 AV @ 1 ST S.E. (#2234) - Route 1
- WB 6 AV S.E. @ 1 ST S.E. (#7466) - Routes 4 & 101
- SB Centre ST S @ 4 AV S. (#6669) - Routes 2, 3 & 17
- WB 6 AV S.W. @ 2 ST S.W. (#5118, temporary stop, nearside) - Routes 2, 4, 17 & 101
- WB 6 AV S.W. @ 70m W. of 1 ST S.W. (temporary stop) - Route 70
Starting Monday, September 1 through Friday, September 12 (only daily between 9 a.m. - 3 p.m.), right hand lane closures will be in effect on westbound Beddington Boulevard at Centre Street N.E. Routes 2, 3 and 46 will have a stop closure.
The following stop will be temporarily closed:
- WB Beddington BV @ Centre ST N stop (#5806 / #8634)
A temporary stop will be placed just 40m west of the closed stop. Started Mon Sep 1 Until Fri Sep 12
Starting Thursday, July 17 at 9 a.m. through Friday, October 17 at 3 p.m., southbound 4 Street @ 14 Avenue will be closed for construction. Routes 3, 17 & 449 will have a stop closure.
The following stop will be temporarily closed:
- SB 4 ST SW @ 14 AV SW - Stop: #7307 - Routes 3, 17 & 449
A temporary stop will be placed:
- SB 4 ST SW@ 15 AV SW - far side
Starting Friday, May 2 at 3 p.m. through Wednesday, December 31, the right-hand lane 5 Avenue S.W. @ east of 1 Street S.W. will be closed for Suncor Energy Centre construction. Routes 2, 3, 17 and 301 will be affected.
The following stop will be temporarily closed:
- EB 5 AV S.W. @ 1 ST S.W. - mid-block (#2940)
Please use the following temporary stops in lieu of the closed stop:
- Route 301:
- EB 5 AV S.W. @ 2 ST S.W. (#4564)
- NB Centre ST S. @ 4 AV S. (#4556)
- Routes 2 & 3:
- EB 5 AV S.W. @ 2 ST S.W. (#5084)
- NB Centre ST S. @ 4 AV S. (#5086)
- Route 17:
- EB 5 AV S.W. @ 2 ST S.W. (#9957)
- NB Centre ST S. @ 4 AV S. (#5086)