•  1-Bowness/Forest Lawn Stop Map

 
Map
 

On Sunday, September 6 from 6 a.m. until approximately 3 p.m. (when the parade ends), there will be several road closures to accommodate Pride Parade. Route 1 will detoured.

Westbound:


  • From westbound Transitway (9 AV Station)
  • East on 9 Ave. S.E.
  • North on 19 St. S.E.
  • East on 17 Ave. S.E.
  • North on Deerfoot Tr.
  • West on Memorial Dr.
  • South over 4 Ave. (Reconciliation Bridge)
  • South on 3 St S.E.
  • West on 6 Ave S.E., to regular route

Eastbound:


  • East on 5 Ave. S.E.
  • Across flyover to Memorial Dr.
  • South on Deerfoot Tr.
  • West on 17 Ave. S.E.
  • South on 19 St. S.E.
  • West on 9 Ave S.E.
  • Turn into eastbound Transitway (9 AV Station), to regular route

The following stops will be temporarily closed:


  • WB 9 Ave. @ 15 St. SE (#8867)
  • WB 9 Ave. @ 14 St. SE (#8849)
  • WB 9 Ave. @ 13 St. SE (#8830)
  • WB 9 Ave. @ 12 St. SE (#9820)
  • WB 9 Ave. @ 11 St. SE (#8831)
  • WB 9 Ave. @ 9 St. SE (#8832)
  • WB 9 Ave. @ The Confluence (#5079)
  • WB 9 Ave. @ 6 St. SE (#3389)
  • NB 3 St. @ 7 Ave. SE (#6853)
  • SB 1 St. @ 7 Ave. SW (#3392)
  • EB 9 Ave. @ Centre St. S (#7380)
  • EB 9 Ave. @ Macleod TR. (#9802)
  • EB 9 Ave. @ 6 St. SE (#3886)
  • EB 9 Ave. @ 8 St. SE (#8844)
  • EB 9 Ave. @ 11 St. SE (#8828)
  • EB 9 Ave. @ 12 St. SE (#9805)
  • EB 9 Ave. @ 13 St. SE (#8845)
  • EB 9 Ave. @ 14 St. SE (#5058)
  • EB 9 Ave. @ 15 St. SE (#8847)
Started Thu Sep 3 Until

Leaflet | Map data © OpenStreetMap contributors


Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 1, 3, 17 & 101 will have a stop closure.

The following stop will be temporarily closed:


  • WB 6 AV SW @ E. of 1 ST SW (#6334)

Please use one of the following stops in lieu of the closed stop:


  • Route 1:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • WB 6 AV SE @ 1 ST SE (#2234)

  • Route 3:

    • WB 6 AV SW @ 2 ST SW (#5178)
    • SB Centre ST S @ 4 AV S (#6669)

  • Route 17:

    • SB Centre ST S @ 4 AV S (#6669)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

  • Route 101:

    • WB 6 AV SE @ 1 ST SE (#7466)
    • WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)

Started Fri Jul 10 Until Thu Dec 31

Starting Monday, February 9 at 9 a.m. through Sunday, November 15 at 9 a.m., there will be lane closures on 9 Avenue S.E. between 5 Street and 6 Street S.E. for 6 ST S.E. underpass construction. Routes 1, 101, 131, 151, 302 and MAX Purple will have stop closures.


The following stops will be temporarily closed:



  • WB 9 AV S.E. @ The Confluence (#5079) - Routes 1 and 101

  • WB 9 AV S.E. @ The Confluence (#9821) - Routes 302 and MAX Purple

  • WB 9 AV S.E. @ 6 ST S.E. (#3389) - Routes 1 and 131

  • EB 9 AV S.E. @ 6 ST S.E. (#3886) - Routes 1, 131, 302 and MAX Purple

  • EB 9 AV S.E. @ 6 ST S.E. (#3917) - Route 151


Please use the following stops in lieu of the closed stops:



  • WB 9 AV S.E. @ 100m east of closed Stop #5079 - Routes 1 and 101

  • WB 9 AV S.E. @ 100m east of closed Stop #9821 - Routes 302 and MAX Purple

  • WB 9 AV S.E. @ 5 ST S.E. - Routes 1 and 131

  • EB 9 AV S.E. @ Olympic WY S.E. - Routes 1, 131, 151, 302 and MAX Purple

Started Mon Feb 9 2026 Until Sun Nov 15