AC Transit
• 19-Alameda Pt-Buena Vista-Fruitvale
Blanding Ave. at Broadway Stop Closed
Due to: Construction
Effective: January 29 – March 20
Please see the AC Transit website for more information: https://www.actransit.org/node/30699
---
Cierre de la parada en Blanding Ave. con Broadway
Debido a: Trabajos de construcción
Efectivo: 29 de enero – 20 de marzo
Por favor visite la página web de AC Transit para más información: https://www.actransit.org/node/30699
---
Blanding Ave. 和 Broadway 交叉口站暂停服务行
由于: 施工
生效日期: 1 月 29 日 – 3 月 20 日
更多详情,请参考 AC Transit 的网站: https://www.actransit.org/node/30699
Willie Stargell Ave. Bus Stop Installation Delayed
Due to construction delays, the installation of Line 19 stops along Willie Stargell Ave. has been delayed. Please use the regular stops listed below until further notice.
To Downtown Oakland
5th St. at Singleton Ave. (Stop ID 51752)
W Atlantic Ave. at Main St. (Stop ID 52827)
To Fruitvale BART
W Atlantic Ave. at Orion St. (Stop ID 52835)
5th St. at Singleton Ave. (Stop ID 51753)
Leaflet | Map data © OpenStreetMap contributors
Service changes effective Sunday, February 1
On Sunday, February 1, AC Transit will make adjustments to the service network to address overcrowding and further increase reliability.
Please see the AC Transit website for more information:
https://www.actransit.org/servicechanges
---
Cambios en el servicio de AC Transit Efectivo el domingo 1 de febrero de 2026
El domingo 1 de febrero, AC Transit realizará ajustes en su red de servicios para abordar la congestión y aumentar aún más la fiabilidad.
Por favor visite la página web de AC Transit para más información:
https://www.actransit.org/es/servicechanges
---
AC Transit 服务变更2026 年 2 月 1 日(周日)起生效
为缓解过度拥挤并进一步提升运营可靠性,AC Transit 将于 2 月 1 日(周日)对现行的线网进行优化调整。
更多详情,请参考 AC Transit 的网站:
https://www.actransit.org/zh/servicechanges