Current time: Refresh

Agencies » Sound Transit

Remove ads by becoming a Premium User

 • : 2 Line-Lynnwood - Downtown Redmond at Bellevue Downtown

1: 1:24 Mins
at . 0:14 behind Vehicle 800.616293 Load 96%? South Bellevue
past Wilburton Only
2: 10 - 13 Mins
at . 0:08 behind Vehicle 803.139430 Load 101%? South Bellevue
past Redmond Technology Only
3: 23 - 31 Mins
at . 5:42 behind Vehicle 800.537199 Load 156%? South Bellevue Last seen 2:09
aprchg Downtown Redmond Only
4: 30 - 34 Mins
at . 0:35 ahead of Vehicle 800.543761 Load 47%? South Bellevue
aprchg Marymoor Village Only
5: 43 - 45 Mins
at . 0:25 ahead of Vehicle 801.240980 Load 122%? South Bellevue
aprchg BelRed Only
East stairwell at South Bellevue Station Garage is closed Started Tue May 20 2025
The east stairwell in the center of the South Bellevue Station Garage is closed until further notice due to needed maintenance. To exit the garage, please use the stairwells located along the perimeters of the north and south ends.

Affected lines:
2 Line

Vehicle 800.539496 aprchg South Bellevue heading South

Add stop (different agency)