Current time: Refresh

Agencies » Sound Transit

Starting tonight at 10 p.m., 2 Line trains will operate only from South Bellevue Station to Downtown Redmond Station. Started Until
2 Line service will be suspended between Lynnwood City Center Station and International District/Chinatown Station at 10 p.m. Please use 1 Line trains instead.

Simulated service with the Crosslake Connection will be suspended from 10 p.m. tonight until end of service. Updates will be provided as available.

Remove ads by becoming a Premium User

 • : 2 Line-Lynnwood - Downtown Redmond at Pioneer Square

1: 5 - 6 Mins
at . 0:40 ahead of Vehicle 891.319410 Load 95%? Int'l Dist/Chinatown
aprchg Capitol Hill Only
2: 15 - 16 Mins
at . 0:55 ahead of Vehicle 892.089128 Load 95%? Int'l Dist/Chinatown
aprchg Roosevelt Only
3: 26 - 30 Mins
at . 0:58 behind Vehicle 891.185207 Load 112%? Int'l Dist/Chinatown
aprchg Shoreline North/185th Only
4: 35 - 39 Mins
at . (Sched. based, vehicle disappeared at ) 0:02 ahead of Int'l Dist/Chinatown Only
5: 45 - 47 Mins
at . (Sched. based, vehicle disappeared at ) 0:43 ahead of Int'l Dist/Chinatown Only
East stairwell at South Bellevue Station Garage is closed Started Tue May 20 2025
The east stairwell in the center of the South Bellevue Station Garage is closed until further notice due to needed maintenance. To exit the garage, please use the stairwells located along the perimeters of the north and south ends.

Affected lines:
2 Line

Vehicle 888.683425 aprchg South Bellevue heading South

Vehicle 887.888753 aprchg South Bellevue heading South

Add stop (different agency)