Current time: Refresh

Agencies » Sound Transit

Remove ads by becoming a Premium User

 • : 2 Line-Lynnwood - Downtown Redmond at Symphony

1: 7 - 8 Mins
at . 1:35 ahead of Vehicle 490.527614 Load 93%? Int'l Dist/Chinatown
aprchg Univ of Washington Only
2: 15 - 17 Mins
at . 2:42 ahead of Vehicle 491.506771 Load 88%? Int'l Dist/Chinatown
aprchg Northgate Only
3: 27 - 30 Mins
at . 0:59 ahead of Vehicle 492.167913 Load 117%? Int'l Dist/Chinatown
aprchg Mountlake Terrace Only
4: 36 - 38 Mins
at . (Sched. based, vehicle disappeared at ) 1:59 ahead of Int'l Dist/Chinatown Only
5: 46 - 48 Mins
at . (Sched. based, vehicle disappeared at ) 1:10 ahead of Int'l Dist/Chinatown Only
East stairwell at South Bellevue Station Garage is closed Started Tue May 20 2025
The east stairwell in the center of the South Bellevue Station Garage is closed until further notice due to needed maintenance. To exit the garage, please use the stairwells located along the perimeters of the north and south ends.

Affected lines:
2 Line
2 Line service from Lynnwood to International District/Chinatown will be suspended from March 18–22. Use 1 Line trains during this time. Starts Wed Mar 18 Until Mon Mar 23
2 Line simulated service between Lynnwood and International District is expected to resume March 23. 2 Line trains will follow the pre-simulated service schedule during the suspension.

2 Line service between Redmond and Lynnwood begins after the ribbon-cutting ceremony on March 28.

Vehicle 485.972957 aprchg South Bellevue heading South

Add stop (different agency)