Agencies » Santa Cruz Metro
Due to the Murray Street Bridge Seismic Retrofit Project, Route 3A Inbound (Capitola Mall to Downtown) will operate on a detour starting March 24, 2025, until further notice. The 3A will continue on 7th Ave to Capitola Road, to Soquel Dr, to Seabright Ave, to Broadway returning to normal routing. Please be prepared for additional detours as the project progresses. Visit https://rt.scmetro.org for METRO Real-Time tracking.
Shown Fri Mar 14 to now
Holiday Service Reminder: Labor Day (Monday, September 1, 2025): No local METRO or ParaCruz service. Highway 17 Express will run on a weekend schedule. Customer Service will be closed.
Shown Wed Jul 9 to now
- Click on the dots to get a link to the trip path for that trip.
- Zoom with mouse wheel or two figures and drag to scroll.
- Click on the legend to hide or show individual vehicles or "Hide all" or "Show all" below.
- Dot size indicates load, where available.