Agencies » San Diego MTS

2-Downtown San Diego - 30th & Adams (stop list)

Date:

Route 2 Temporary Bus Stop Closure, Broadway & 15th St (#10863) Started Until
Due to paving, the southbound route 2 bus stop located at Broadway & 15th St (#10863), will be temporarily closed Tuesday 03/03/26 between the hours of 7:00am - 5:00pm.

Passengers are advised to catch the southbound route 2 at Broadway &13th at the a - frame
Shown to
N/B Route 2 Bus Stop Closed At 30th & C St (#10166) Started Mon Sep 29 Until Tue Mar 31
Due to construction at 30th & C St (#10166), the northbound route 2 bus stop will be closed 09/29/25 - 03/31/26 from 06:OOam-3:30pm (Mon - Fri) . Passengers may catch the northbound route 2 at 30th & A St (#13532).
Shown Sun Feb 15 to now
Route 2 Temporary Bus Stop Closure, C St & 26th St (#11280) Started Wed Jul 16 2025 Until Tue Mar 31
Due to construction, the southbound route 2 bus stop located at C St & 26th St will be temporarily closed on different dates from 07/16/25 - 03/31/26

When C St is closed between 26th St & 25th St, passengers are advised to catch the southbound 2 at C St & 27th St (#10904) or 25th & Broadway (#11684).
Shown Sun Feb 15 to now
Alert Info
Blue Line trolleys are delayed. Displayed times may not reflect delays.
Shown to
Alert Info
Green Line trolleys are delayed. Displayed times may not reflect delays.
Shown to
Alert Info
Blue and Green Line trolleys are delayed. Displayed times may not reflect delays.
Shown to
Route 2 Temporary Bus Stop Closure, Broadway & 15th St (#10863) Started Until
Due to paving, the southbound route 2 bus stop located at Broadway & 15th St (#10863), will be temporarily closed Tuesday 03/03/26 between the hours of 7:00am - 5:00pm.

Passengers are advised to catch the southbound route 2 at Broadway &13th at the a - frame
Shown to now
Alert Info
Orange Line trolleys are delayed. Displayed times may not reflect delays.
Shown to now
Route 2 Impacted by "Hot Chocolate Run" on Sunday, 3/8 Starts Sun Mar 8 Until Sun Mar 8
MTS Route 2 will be impacted by the "Hot Chocolate Run" on Sunday, March 8th from 6:45am thru 8:15am. Southbound Route 2 bus stops on Broadway between 25th and 11th will not be serviced. Passengers needing to connect with the southbound Route 2 can do so on 25th at Broadway. Northbound Route 2 bus stops on Broadway between Park and 21st will not be serviced. Passengers needing to connect with the northbound Route 2 can do so on Broadway at Park or on Broadway at 22nd. After 8:15am, service on Broadway will resume with possible minor delays until approximately 10:45am.
Shown Sun Feb 15 to now
Route 2 Temporary Bus Stop Closure, Broadway & 15th St (#10863) Started Until
Due to paving, the southbound route 2 bus stop located at Broadway & 15th St (#10863), will be temporarily closed Tuesday 03/03/26 between the hours of 7:00am - 5:00pm.

Passengers are advised to catch the southbound route 2 at Broadway &13th at the a - frame
Shown Sun Mar 1 to Tue Mar 3